This past February 2010, the ADAM team conducted an ice dive with plans for more underwater photography and videography. However, repair work near the Rt. 9 bridge resulted in a very limited visibility of 2-3 feet near the surface. While the photography was canceled, the dive served as a good trial run for future through the ice